Art's Boat Build
Building a Glen-L Squirt
Wednesday, April 28, 2010
Epoxy, Sand, Clean - Repeat
›
After the fiberglass cloth is on the boat, the process of building up the level of epoxy begins. It took about 3 coats to get the thickness...
Monday, April 5, 2010
Fiberglassing
›
Once the boat looked all nice and shiny with perfect wood grain showing through the epoxy finish, it was time to mess it up...big time. So I...
Wednesday, March 24, 2010
It'll Float
›
The bottom plywood has been trimmed, planed, filed and sanded. So the planking is now completed. Screw holes have been filled, sanded, fil...
Friday, March 19, 2010
Some Tips and Things Leaned along the way
›
Raising the bar: So far I've been happy that I raised the form that the boat frames mount to. The plan says 24" off the floor, but ...
Monday, March 15, 2010
Beginning at the Bottom
›
The first step was bending the forward end of the long battens into position by sawing a horizontal kerf back almost to the frame and then ...
Monday, March 8, 2010
Second Verse same as the First
›
When I got ready for putting on the second side, I enlisted some help. With the first side, after juggling the long panel and then clampin...
Wednesday, March 3, 2010
Outboard Motor purchased
›
Since the boat I'm building has a retro look, I wanted to get a classic outboard for it. After doing a lot of research on older outboard...
1 comment:
‹
›
Home
View web version